Parking on the Downs House triangle: a limited consultation on proposals is expected soon.
Repair works to water pipes to gypsy site: repairs were required to the water supply to the gypsy site on the downs, used during the Derby fortnight. The costs had not yet been ascertained, but might be between £3k and £5.5k. I arrived slightly late, and it was clear that there had already been some mixed views expressed about who should pay. There was concern that if the conservators covered the costs, it would establish a liability for the future. Conservators agreed that a contribution would be appropriate, on the basis that the gypsy site existed at the discretion of the conservators. Was the racecourse prepared to maintain the investment — the racecourse representative said (more or less) that it was. The chairman proposed a contribution of £1k; two (councillor) members suggested that the conservators should fund the whole cost, or at least half. The chairman upped the proposal to half of the maximum cost anticipated in the report: this was agreed, with one member proposing raising the site fees to recover the expenditure.
Radio controlled dethermaliser: the Epsom Downs Model Aircraft Club had sought approval for its members to use the device to help control the landing of free-flight model aircraft on land designated for craft of this kind (which is a much larger area of the downs than permitted for radio-controlled aircraft: see byelaw 7(2)). It was proposed that club members operating these devices should wear an arm-band to identify their membership. This was agreed. [Ed: The legal advice failed to resolve the tension that byelaw 7(1) simply doesn’t allow the use of radio-controlled aircraft over the larger area: this is not something the conservators have power to resolve.]
Cabling works on downs: a proposal to carry out works in the owners’ and trainers’ car park on the downs. This would upgrade to meet modern technology requirements. The works would be near the path from the Ashley Road signalled crossing to the Rubbing House crossing of the racecourse. An alternative route onto the downs may be required while the works take place, which could last a fortnight. Agreed.
2018–19 budget: the condition of some of the car parks had deteriorated, and provision had been made for increased repair costs, which called for a 3.1% increase in the budget, compared with the previously agreed 2% rise. The budget was agreed with only one question.
Racing season: an extension to the fencing period, and racing on certain Sundays and evenings, was agreed. The racecourse would seek powers from the traffic regulation authority to close one of the footpaths across the racecourse on Ladies’ Day and Derby Day. The racecourse will run four race evenings with decadal themes from the 1960s onwards, but no big name act is likely.
Sand track: a member asked about whether there had been a response from the Horse Race Levy Board. An office said contact had been made with the Levy Board, and discussions were taking place.